| Levels | Storage Conditions | Floor Life | Handling | Drying |
|---|---|---|---|---|
| MSL 1 | ≤ 30°C/85% RH | Indefinite | No special controls needed | Pre-bagging: Optional Desiccant: Optional Label: If >235°C |
| MSL 2 | ≤ 30°C/60% RH | 1 year | Requires dry pack | Pre-bagging: Optional Desiccant: Required Label: Required |
| MSL 2a | ≤ 30°C/60% RH | 4 weeks | Requires dry pack | Pre-bagging: Required Desiccant: Required Label: Required |
| MSL 3 | ≤ 30°C/60% RH | 168 hours | Requires dry pack | |
| MSL 4 | ≤ 30°C/60% RH | 72 hours | Requires dry pack | |
| MSL 5 | ≤ 30°C/60% RH | 48 hours | Requires dry pack | |
| MSL 5a | ≤ 30°C/60% RH | 24 hours | Requires dry pack | |
| MSL 6 | ≤ 30°C/60% RH | 72 hours, Must be baked | Requires dry pack and baking | Pre-bagging: Optional Desiccant: Optional Label: Required |
Energy. Teamwork. Connection.
— POE PCB/PCBA Manufacturer (@poe_pcba) October 27, 2025
Our 2025 POE Autumn Hiking Event — “Walk with Vitality, Unite with Strength” — reminded us that great things, like great teams, are built step by step.
Here’s to every mile walked together, both outdoors and in our work.
#Culture #Teamwork pic.twitter.com/ZdpE8NFSgw
Since 1996, POE has become a globally renowned PCB company, providing small to medium volume PCB/ PCBA manufacturing services.
