Product | Supplier | Lead time | Price | Note | |
Nowadays | Future trends(Three months) | Future trends(Three months) | |||
SMD resistor | Panasonic | 50-60 weeks | Stabilize | Stabilize |
|
Vishay | 22-26 weeks | Stabilize | Rise | ||
Yageo | 12-28 weeks | Stabilize | Stabilize |
||
Walsin | 16-25 weeks | Stabilize | Stabilize |
The cost increases take effect in May 2023 | |
Resistor Networks and arrays | Bourns | 15-26 weeks | Stabilize | Rise |
|
Bishay | 30-50 weeks | Stabilize | Stabilize |
||
Yageo | 16-28 weeks | Stabilize | Stabilize |
||
Walsin | 15-24 weeks | Stabilize | Stabilize |
Price increase due to increased raw material and logistics costs | |
Non thermal resistor/ thermistor | Epcos | 18-30 weeks | Stabilize | Rise |
|
Murata | 20-24 weeks | Stabilize | Stabilize |
Price increase due to increasedraw material and logistics costs | |
Vishay | 20-30 weeks | Stabilize | Rise |
||
Trimmer & Potentiometer | Bourns | 20-44 weeks | Extension | Rise |
|
TT Electronics | 20-44 weeks | Stabilize | Stabilize |
||
Vishay | 20-60 weeks | Stabilize | Rise |
||
Overvoltage protection varistor | AVX | 17-30 weeks | Stabilize | Stabilize |
|
Bourns | 16-40 weeks | Stabilize | Rise |
||
Littelfuse | 20-40 weeks | Extension | Rise |
||
Epcos | 20-30 weeks | Stabilize | Rise |
||
Overvoltage protection varistor | AVX | 10-50 weeks | Stabilize | Stabilize |
|
Bourns | 14-54 weeks | Stabilize | Rise |
||
Littelfuse | 15-40 weeks | Stabilize | Stabilize |
Due to increased raw material andlogistics costs leading to priceincreases, APAC prices increase | |
Product | Supplier | Lead time | Price | Note | |
Nowadays | Future trends(Three months) | Future trends(Three months) | |||
Overcurrent protection fuse | Bourns | 16-20 weeks | Stabilize | Rise |
|
Littelfuse | 15-30 weeks | Stabilize | Stabilize | ||
Schurter | 15-35 weeks | Stabilize | Stabilize |
||
Frequency controlled crystal &oscillator | Abracon | 30-99 weeks | Extension | Rise |
APAC: MEMS oscillator is still being allocated |
Kyocera | 14-35 weeks |
Extension |
Stabilize |
||
ESC | 30-52 weeks | Extension | Rise |
||
IQD | 30-35 weeks | Extension | Stabilize |
||
TXC | 18-52 weeks | Stabilize | Stabilize |
||
Frequencycontrolled resonator | Abracon | 9-30 weeks | Stabilize | Stabilize |
|
Geyer | 9-16 weeks | Stabilize | Stabilize |
||
Murata | 9-24 weeks | Stabilize | Stabilize |
||
Variable frequenc controller | Abracon | 24-50 weeks | Stabilize | Stabilize |
|
Murata | 16-24 weeks | Stabilize | Stabilize |
||
Ceramic multilayercapaciton | AVX | 14-30 weeks | Stabilize | Rise |
|
Kemet | 20-38 weeks | Extension | Rise |
LT added to automotive grade MLCC | |
Murata | 15-22 weeks | Stabilize | Stabilize |
||
Samsung EM | 18-22 weeks | Extension | Stabilize |
||
Tantalum capacitor | AVX | 12-36 weeks | Extension | Stabilize |
|
Kemet | 16-36 weeks | Stabilize | Stabilize |
||
Samsung EM | 25-27 weeks | Stabilize | Stabilize |
||
Vishay | 18-42 weeks |
Stabilize |
Stabilize | ||
Thin film capacitor | Epcos | 26-70 weeks |
Stabilize |
Stabilize | |
Kemet | 26-35 weeks |
Stabilize |
Stabilize | ||
Vishay | 18-24 weeks |
Extension |
Decrease | ||
Wima | 14-20 weeks |
Stabilize |
Stabilize | ||
Product | Supplier | Lead time | Price | Note | |
Nowadays | Future trends(Three months) | Future trends(Three months) | |||
Aluminum capacitor | Epcos | 40-44 weeks | Stabilize | Rise |
|
Nichicon | 56-60 weeks | Shorten | Stabilize | ||
Panasonic | 46-50 weeks | Stabilize | Rise |
||
Vishay | 22-26 weeks | Stabilize | Stabilize |
||
Choke coil inductor | Abracon | 12-24 weeks | Stabilize | Stabilize |
|
Bourns | 22-28 weeks |
Stabilize |
Stabilize |
||
Eaton | 15-20 weeks |
Stabilize |
Stabilize |
||
Epcos/ TDK | 48-52 weeks |
Extension |
Rise |
||
Murata | 18-25 weeks | Stabilize | Stabilize |
||
Pulse | 16-22 weeks | Stabilize | Stabilize |
||
Vishay | 18-22 weeks | Stabilize | Decrease | ||
Transformer | Bourns | 22-26 weeks | Stabilize | Rise |
|
Epcos | 12-30 weeks | Stabilize | Rise |
||
Pulse | 16-22 weeks | Stabilize | Stabilize |
||
Soft magnetic ferrite | Epcos | 30-50 weeks | Stabilize | Rise |
|
Ferroxcube | 8-20 weeks | Stabilize | Rise |
||
Filter (EMI) | Abracon | 10-14 weeks | Stabilize | Stabilize |
|
Epcos | 15-30 weeks | Stabilize | Rise |
||
Schaffner | 14-20 weeks | Stabilize | Rise |
||
TE Connectivity | 20-22 weeks | Extension | Rise |
||